Iqaluit Nukkiksautiit Hydroelectric Project
Sector: Power Generation (CCGT) • Location: Iqaluit, Nunavut, Canada
Source: Canada's National Observer
A hydroelectric project led by Nunavut Nukkiksautiit Corporation to build a 50-metre-high dam and powerhouse on the Kuugaluk River, about 60 km northeast of Iqaluit, aiming to replace the city's diesel power plant with clean electricity, reducing greenhouse gas emissions by about 65,000 tonnes annually.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Hydro, Government, Water Supply and Storage
- Location
- Iqaluit, Nunavut, Canada
- Updated
- 22 Jul 2026
- Source
- Canada's National Observer
ConstructChat
Ask ConstructChat about Iqaluit Nukkiksautiit Hydroelectric Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A hydroelectric project led by Nunavut Nukkiksautiit Corporation to build a 50-metre-high dam and powerhouse on the Kuugaluk River, about 60 km northeast of Iqaluit, aiming to replace the city's diesel power plant with clean electricity, reducing greenhouse gas emissions by about 65,000 tonnes annually. |
Original sector | Energy |
Budget |
Location
Country | Canada |
State | Nunavut |
City | Iqaluit |
Source
Source | Canada's National Observer |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro, Government, Water Supply and Storage |
Article published date | 2025-11-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
