Iquitos Nueva Thermal Power Plant
Sector: Commercial • Location: Loreto, Peru
Source: World Bank Group
In May 2013, the Brazilian company Genrent, a subsidiary of the American company First Solar, was granted the right to build and operate a thermal power plant (diesel fueled) located in Iquitos (Maynas province), with 70 MW in capacity. The power plant was named Central Termoelectrica Iquitos Nueva. The electricity from the power plant was set to be directed to the national grid under a 20-year p
- Status
- Prospective
- Sector
- Commercial, Geothermal, Power Generation (CCGT), Solar, Government
- Location
- Loreto, Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Iquitos Nueva Thermal Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In May 2013, the Brazilian company Genrent, a subsidiary of the American company First Solar, was granted the right to build and operate a thermal power plant (diesel fueled) located in Iquitos (Maynas province), with 70 MW in capacity. The power plant was named Central Termoelectrica Iquitos Nueva. The electricity from the power plant was set to be directed to the national grid under a 20-year power purchase agreement signed with the Ministry of Energy. The bidding criteria established by the regulatory agency Proinversion was the lowest tariff. Besides Genrent, only Cobra Instalaciones y Servicios took part in the contest. The contract was signed in September 2013, and its duration included 30 months for the construction and 20 years for the operation of the power plant. The sponsor created the company Genrent del Peru S.A.C. to manage the project. The sponsor committed to invest US$ 100 million in the construction of the power plant. Financial closure was achieved in May 2014, when the sponsor was granted a US$ 30 million loan from Espirito Santo Bank. Operations were set to begin in 2016. |
Original sector | Energy |
Budget |
Location
Country | Peru |
State | Loreto |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Power Generation (CCGT), Solar, Government |
Article published date | 2024-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
