Iracema Transmissora de Energia

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Active

In November 2007, Cymi Holding, a subsidiary of the Spanish Group ACS (which, in turn, belongs to Dragados group), was awarded in a competitive bidding process the 30-year contract to build and operate a 400-km transmission line located in the states of Piaui, Pernambuco and Ceara. Besides Cymi, nine other companies/consortiums took part in the contest: Isolux; Cobra Instalaciones y Servicios; Ab

Status
Prospective
Sector
Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Iracema Transmissora de Energia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Iracema Transmissora de Energia” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In November 2007, Cymi Holding, a subsidiary of the Spanish Group ACS (which, in turn, belongs to Dragados group), was awarded in a competitive bidding process the 30-year contract to build and operate a 400-km transmission line located in the states of Piaui, Pernambuco and Ceara. Besides Cymi, nine other companies/consortiums took part in the contest: Isolux; Cobra Instalaciones y Servicios; Abengoa Construcao Brasil; Schahin Engenharia; Cia Técnica de Engenharia Eletrica; CTEEP; Empresa Amazonense de Transmissao de Energia; Elecnor; Consorcio São Joao do Piaui – Milagres (CHESF, ELETRONORTE, Brasil Energia and Terna). The bidding criteria set by the federal regulatory agency ANEEL was the lowest required annual revenue. Cymi presented the lowest offer, a total value of US$ 7.5 million (BRL 13.8 million), 56.86% the ceiling set by the regulatory agency. The contract was signed in March 2008, and Cymi created the company Iracema Transmissora de Energia to lead the project during the 30-year contract period. The sponsor committed to invest US$ 131 million (BRL 261.9 million) in the transmission line. Financial closure was achieved in April 2009, when the sponsor was granted a US$ 52.4 million (BRL 206 million) loan from Santander Bank. The remaining cost was set to be financed with the sponsors’ internal resources. Environmental clearance was granted in July 2009, but, as of June 2010, the construction works had not yet commenced. The works on the transmission lines were expected to be completed in 11 months. In 2011, the project company ownership was sold to the companies Barra do Peixe Montagens e Servicos (0.01%) e a Lintran do Brasil Participacoes (99.99%), a subsidiary of the spanish group Cobra. In October 2012, the Chinese company State Grid acquired seven transmission line projects that belonged to group Cobra for US$ 537.9 million (BRL 1.05 billion), besides taking the responsibility of US$ 417 million (BRL 814 million) in debt. Still couldn´t confirm financial closure, though it was stated at the impact of the crisis database as such.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Commercial

Article published date

2024-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project