IRB Talegaon Amravati Toll Road Pvt. Ltd
Sector: Road • Location: India
Source: World Bank Group
In August 2009, the National Highway Authority of India (NHAI) awarded a 22 year concession (including construction period of 910 days) with a consortium of India’s IRB Infrastructure Limited and MRM Private Limited for the strengthening, improvement, four-laning, operation and maintenance, and tolling of a 102 km stretch on National Highway-6 (NH-6 from Km.100.000 to Km.166.725) in the state of M
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In August 2009, the National Highway Authority of India (NHAI) awarded a 22 year concession (including construction period of 910 days) with a consortium of India’s IRB Infrastructure Limited and MRM Private Limited for the strengthening, improvement, four-laning, operation and maintenance, and tolling of a 102 km stretch on National Highway-6 (NH-6 from Km.100.000 to Km.166.725) in the state of Maharashtra. Under the contract, the consortium was responsible for the design, construction, finance, operation and maintenance and widening of the existing two-lane highway to a four-lane highway with paved shoulders. The expansion project, part of National Highway Development Project Phase - III, was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. The consortium of IRB and MRM established IRB Talegaon Amravati Tollway Private Limited, a special purpose vehicle, to implement the project. The consortium won the tender through competitive bidding, conducted by NHAI, by requesting for the lowest subsidy requirement of US$ 44.6 million (INR 2160 million @ 48.41 INR/USD). Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. Other bidding details were not available at the time of collection of this information. The concession agreement was signed in November 18th, 2009. The estimated capital cost of the project at the time of bidding was US$ 154.1 million (INR 7460 mn @ 48.41 INR/USD) million. Construction on the project began in Nov 2009 and was expected to be completed by Nov 2012. The project reached financial closure on March 31, 2010, sole bookrunner and mandated lead arranger IDFC (INR2000m), along with lenders Canara Bank (INR 1000m), Bank of Baroda (INR950m), and Union Bank of India (INR 800m), syndicated an INR 4750m term loan facility, maturing April 15, 2026, for the INR 8,880m Talegaon -Amravati Highway Project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
