Ircon – Soma Tollway Private Limited
Sector: Commercial • Location: India
Source: World Bank Group
In September 2005, National Highways Authority of India (NHAI) signed a 20 year concession agreement with Ircon – Soma Tollway Private Limited (ISTPL) for the upgrade, operation and maintenance of the 118 km stretch on National Highway 3 (NH-3), between Dhule and Pimpalgaon, in the state of Maharashtra. Under the agreement, ISTPL was required to design, finance and widen the existing two-lane stre
- Status
- Prospective
- Sector
- Commercial, Road, Manufacturing (Industrial), Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Ircon – Soma Tollway Private Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In September 2005, National Highways Authority of India (NHAI) signed a 20 year concession agreement with Ircon – Soma Tollway Private Limited (ISTPL) for the upgrade, operation and maintenance of the 118 km stretch on National Highway 3 (NH-3), between Dhule and Pimpalgaon, in the state of Maharashtra. Under the agreement, ISTPL was required to design, finance and widen the existing two-lane stretch to a four lane highway with paved shoulders. In addition, ISTPL was also responsible for the construction of 14 km of service roads on both sides of the highway, two toll plazas, two truck laybys and one rest area. The concession term included the construction period of 36 months. The Dhule-Pimpalgaon road upgrade project, part of the National Highway Development Project – Phase III A, was in response to an urgent need to strengthen and upgrade the region’s roads due to a considerable increase in traffic and commercial activities. ISTPL was a joint venture with equal ownership between India’s Ircon International Limited and Soma Enterprise Limited. The Soma-Ircon consortium won the concession in an international competitive tender, conducted by NHAI, by offering to make an upfront payment of US$ 13 million for the right to collect tolls during the term of the concession. India’s highway development policy allowed ‘viability funding’ by NHAI to the tune of 40 percent of the capital costs as grant to the concessionaire, subject to competitive bidding. However, in high traffic density corridors like this one that are very profitable, the bidders usually offered an upfront payment to NHAI instead of seeking a grant. The total capital cost of the project was estimated at US$ 133.7 million, including the upfront payment to NHAI. The project reached financial closure in November 2006. The debt was arranged by a consortium led by State Bank of India and included State Bank of Hyderabad, State Bank of Patiala, State Bank of Bikaner & Jaipur, Allahabad Bank, UCO Bank, United Bank of India and Bank of Maharashtra. Construction work on the project began in March 2006 and was expected to be completed by March 2009. As per NHAI, the project was completed on March 2010 and is currently operational. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Manufacturing (Industrial), Government |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in India
- Mundra Ultra Mega Power Plant Gujarat
- ONGC Tripura Power Plant
- Salaya Power Project Gujarat
- Cable-stayed bridge project in the Chambal River
- Construction services for the wellness center component of NexusPark for the Columbus Regional Health and the City of Columbus in Indiana (United States)
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Mytrah Energy Limited- 100.3MW Savalsang Windfarm
