Irecê Solar Complex – Phase 1
Completed · Bahia · Last reported Dec 2025
Source: SolarQuarter
The Irecê Solar Complex – Phase 1, located in João Dourado, Bahia, Brazil, comprises the Solar Irecê and Solar Irecê 3 plants with a total installed capacity of 133.40 MW. It includes 42 generating units connected to the National Interconnected System (SIN) through the Irecê 230/138 kV Substation. The project is part of Brazil's New Growth Acceleration Program (Novo PAC) and aims to expand renewab
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT), Commercial
- Location
- João Dourado, Bahia, Brazil
- Updated
- 22 Jul 2026
- Source
- SolarQuarter
ConstructChat
Ask ConstructChat about Irecê Solar Complex – Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Irecê Solar Complex – Phase 1, located in João Dourado, Bahia, Brazil, comprises the Solar Irecê and Solar Irecê 3 plants with a total installed capacity of 133.40 MW. It includes 42 generating units connected to the National Interconnected System (SIN) through the Irecê 230/138 kV Substation. The project is part of Brazil's New Growth Acceleration Program (Novo PAC) and aims to expand renewable energy generation and support regional economic development. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Bahia |
City | João Dourado |
Source
Source | SolarQuarter |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Commercial |
Article published date | 2025-12-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
