logo

Iren S.p.A. 2025–2030 Industrial Plan

Sector: Water Supply and Storage • Location: Italy

Source: TS2

Project
Planned

Iren S.p.A. is implementing a multi-billion-euro capital expenditure plan through 2030, focusing on infrastructure expansion, renewables, waste management, and sustainability. The plan includes over €8 billion earmarked for sustainability and service quality improvements, such as renewable energy capacity, upgraded electricity and gas grids, water network improvements, waste recycling plants, and

Status
Prospective
Sector
Water Supply and Storage, Biomass, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)
Location
Italy
Updated
22 Jul 2026
Source
TS2

ConstructChat

Ask ConstructChat about Iren S.p.A. 2025–2030 Industrial Plan

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Iren S.p.A. 2025–2030 Industrial Plan” is an infrastructure initiative in the Water Supply and Storage sector, located in Italy. Taiyo aggregates data on it from TS2.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Iren S.p.A. is implementing a multi-billion-euro capital expenditure plan through 2030, focusing on infrastructure expansion, renewables, waste management, and sustainability. The plan includes over €8 billion earmarked for sustainability and service quality improvements, such as renewable energy capacity, upgraded electricity and gas grids, water network improvements, waste recycling plants, and digital upgrades. The company aims to grow EBITDA from around €1.2 billion in 2023 to approximately €1.8 billion by 2030, targeting a compound annual growth rate of about 6%.

Original sector

Energy

Budget

Location

Country

Italy

Source

Source

TS2

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Biomass, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2025-11-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project