Iron Mesa Gas Processing Facility
Sector: Natural Gas • Location: Texas, United States
Source: Rigzone
Phillips 66 is set to build a natural gas processing plant with a capacity of 300 million cubic feet per day in the Permian Basin, expected to start operations in Q1 2027. This facility will support production from the Delaware and Midland Basins.
- Status
- Prospective
- Sector
- Natural Gas, Metal, Steel
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Rigzone
ConstructChat
Ask ConstructChat about Iron Mesa Gas Processing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phillips 66 is set to build a natural gas processing plant with a capacity of 300 million cubic feet per day in the Permian Basin, expected to start operations in Q1 2027. This facility will support production from the Delaware and Midland Basins. |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Rigzone |
URL |
More Details
Record type | Project |
Sector | Natural Gas, Metal, Steel |
Article published date | 2025-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Natural Gas projects in United States
- Fort Benning, Georgia
- Mountain Valley Pipeline (MVP) Project, Virginia
- AES Sparrows Point LNG Facility, Baltimore, Maryland, USA
- Rover Pipeline Project
- Golden Pass LNG Project, Sabine Pass, Texas
- Dempsey Gas Project, Sacramento Gas Basin, California
- Dolphin Gas Project, Ras Laffan
- Driftwood LNG Export Project, Louisiana
