IRON ORE GUELBS-PHAS
Sector: Water Supply and Storage • Location: Mauritania
Source: World Bank Group
The Guelbs Iron Ore Project for Mauritania consists of the sequential development of two new iron ore open pits with proven reserves of 386 million tons, both located in proximity to the present mining town of Zouerate and existing intrastructure, to gradually replace the Kedia pits now being depleted. Implementation of the project would be carried out in two phases to ultimately increase the pres
- Status
- Closed
- Sector
- Water Supply and Storage, Rail, Power Generation (CCGT), Steel, Metal, Government
- Location
- Mauritania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about IRON ORE GUELBS-PHAS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Guelbs Iron Ore Project for Mauritania consists of the sequential development of two new iron ore open pits with proven reserves of 386 million tons, both located in proximity to the present mining town of Zouerate and existing intrastructure, to gradually replace the Kedia pits now being depleted. Implementation of the project would be carried out in two phases to ultimately increase the present production capacity of 11.5 million tons to about 14 million tons a year by 1984. Although the Guelbs ore is of a different quality (lower iron content) than the Kedia ore, with magnetic concentration the products will actually be of higher grade and will have good marketing characteristics. The main components are: (i) construction of concentration/beneficiation facilities to upgrade the low grade ore (30-40 percent Fe) to an acceptable sinter feed (65 percent Fe); (ii) extension of the railroad from F'Derik to El Rhein (45 km) and increase of existing rail capacity and port facilities to handle 14 million tons of ore per year; (iii) a new power plant, additional water supply, housing and other auxiliary facilities and services; and (iv) engineering, project management and training. |
Original sector | (Historic)Mining |
Location
Country | Mauritania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Power Generation (CCGT), Steel, Metal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
