logo

IRON ORE GUELBS-PHAS

Sector: Water Supply and Storage • Location: Mauritania

Source: World Bank Group

Project
Closed

The Guelbs Iron Ore Project for Mauritania consists of the sequential development of two new iron ore open pits with proven reserves of 386 million tons, both located in proximity to the present mining town of Zouerate and existing intrastructure, to gradually replace the Kedia pits now being depleted. Implementation of the project would be carried out in two phases to ultimately increase the pres

Status
Closed
Sector
Water Supply and Storage, Rail, Power Generation (CCGT), Steel, Metal, Government
Location
Mauritania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about IRON ORE GUELBS-PHAS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “IRON ORE GUELBS-PHAS” is an infrastructure initiative in the Water Supply and Storage sector, located in Mauritania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Guelbs Iron Ore Project for Mauritania consists of the sequential development of two new iron ore open pits with proven reserves of 386 million tons, both located in proximity to the present mining town of Zouerate and existing intrastructure, to gradually replace the Kedia pits now being depleted. Implementation of the project would be carried out in two phases to ultimately increase the present production capacity of 11.5 million tons to about 14 million tons a year by 1984. Although the Guelbs ore is of a different quality (lower iron content) than the Kedia ore, with magnetic concentration the products will actually be of higher grade and will have good marketing characteristics. The main components are: (i) construction of concentration/beneficiation facilities to upgrade the low grade ore (30-40 percent Fe) to an acceptable sinter feed (65 percent Fe); (ii) extension of the railroad from F'Derik to El Rhein (45 km) and increase of existing rail capacity and port facilities to handle 14 million tons of ore per year; (iii) a new power plant, additional water supply, housing and other auxiliary facilities and services; and (iv) engineering, project management and training.

Original sector

(Historic)Mining

Location

Country

Mauritania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Rail, Power Generation (CCGT), Steel, Metal, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project