logo

Iron-Sodium Battery Pilot at Swiss Data Center

Sector: Metal • Location: Bern, Switzerland

Source: IndexBox

Project
Planned

A 600 kWh (25 kW) iron-sodium battery installation pilot project at a Tier IV data center in Bern, Switzerland, operated by NTS Colocation. The project aims to demonstrate the battery technology as an alternative to diesel generators and lithium-ion systems, with plans to expand to 2 MW capacity by 2028 if successful.

Status
Prospective
Sector
Metal, Energy Storage, Data Center
Location
Bern, Switzerland
Updated
22 Jul 2026
Source
IndexBox

ConstructChat

Ask ConstructChat about Iron-Sodium Battery Pilot at Swiss Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Iron-Sodium Battery Pilot at Swiss Data Center” is an infrastructure initiative in the Metal sector, located in Bern, Switzerland. Taiyo aggregates data on it from IndexBox.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 600 kWh (25 kW) iron-sodium battery installation pilot project at a Tier IV data center in Bern, Switzerland, operated by NTS Colocation. The project aims to demonstrate the battery technology as an alternative to diesel generators and lithium-ion systems, with plans to expand to 2 MW capacity by 2028 if successful.

Original sector

Energy Storage

Location

Country

Switzerland

City

Bern

Source

Source

IndexBox

URL

More Details

Record type

Project

Sector

Metal, Energy Storage, Data Center

Article published date

2026-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project