logo
ProjectClosed

IRRIG. II NYAUNGGYAT

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The project would be the first step in a long-term program of land and water development in the Panlaung and Samon River Valleys in the central dry zone of Burma. It would provide year-round irrigation for about 200,000 acres in the Mandalay Division in Upper Burma. About 88,000 acres of this area are under an existing irrigation system which is only capable of providing irrigation for one crop du

Status
Closed
Sector
Water Supply and Storage, Fertilizers, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Raw Materials, Government
Location
Myanmar (Burma)
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about IRRIG. II NYAUNGGYAT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “IRRIG. II NYAUNGGYAT” is an infrastructure initiative in the Water Supply and Storage sector, located in Myanmar. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project would be the first step in a long-term program of land and water development in the Panlaung and Samon River Valleys in the central dry zone of Burma. It would provide year-round irrigation for about 200,000 acres in the Mandalay Division in Upper Burma. About 88,000 acres of this area are under an existing irrigation system which is only capable of providing irrigation for one crop during the monsoon season. With the construction of the proposed Nyaunggyat Dam, and the flood control works, the project area would receive assured water supplies for irrigation, allowing double cropping. To help achieve this, the project provides for the rehabilitation of the existing inefficient and silted-up irrigation system and construction of new irrigation and drainage facilities in the new areas. Complementary measures include on-farm development, improved water management, agriculture extension and research, farm mechanization, technical assistance, and training. The project would also provide for hydroelectric power generation with a maximum generating capacity of 56 MW and an average annual energy production of 165 GWh. The project would benefit about 33,000 farm families, double the utilization of family labor and increase hired labor requirements by about 38.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Myanmar (Burma)

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Fertilizers, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project