logo
ProjectClosed

IRRIG. II (PENARANDA

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The project includes: (a) construction of two earth and rockfill dams on the Canili and Diayo rivers with diversion channels to divert the water into the Pampanga river basin; (b) raising and improvement of the Pampanga-Bongabon diversion dam and enlarging and extending for 19 km, the main canal and lateral G-2 of the Pampanga-Bongabon River Irrigation System (PBRIS); (c) rehabilitation of an exis

Status
Closed
Sector
Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Hydro, Raw Materials, Government
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about IRRIG. II (PENARANDA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “IRRIG. II (PENARANDA” is an infrastructure initiative in the Road sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes: (a) construction of two earth and rockfill dams on the Canili and Diayo rivers with diversion channels to divert the water into the Pampanga river basin; (b) raising and improvement of the Pampanga-Bongabon diversion dam and enlarging and extending for 19 km, the main canal and lateral G-2 of the Pampanga-Bongabon River Irrigation System (PBRIS); (c) rehabilitation of an existing irrigation and drainage system of about 16,700 ha; (d) construction of a new irrigation and drainage system to serve an area of about 8,600 ha which is now rainfed; (e) improvement of existing drainage channels and construction of cross-drainage and diversion structures to collect local flows; (f) upgrading of existing project roads and construction of additional roads in the area; and (g) procurement of vehicles and equipment. The project also includes provision for a comprehensive study of the water and land resources of the Central Luzon Basin with the objective of identifying potential irrigation projects and formulating a plan for their development taking into account other beneficial water resources.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Hydro, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project