IRRIG. II (PENARANDA
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project includes: (a) construction of two earth and rockfill dams on the Canili and Diayo rivers with diversion channels to divert the water into the Pampanga river basin; (b) raising and improvement of the Pampanga-Bongabon diversion dam and enlarging and extending for 19 km, the main canal and lateral G-2 of the Pampanga-Bongabon River Irrigation System (PBRIS); (c) rehabilitation of an exis
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Hydro, Raw Materials, Government
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about IRRIG. II (PENARANDA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes: (a) construction of two earth and rockfill dams on the Canili and Diayo rivers with diversion channels to divert the water into the Pampanga river basin; (b) raising and improvement of the Pampanga-Bongabon diversion dam and enlarging and extending for 19 km, the main canal and lateral G-2 of the Pampanga-Bongabon River Irrigation System (PBRIS); (c) rehabilitation of an existing irrigation and drainage system of about 16,700 ha; (d) construction of a new irrigation and drainage system to serve an area of about 8,600 ha which is now rainfed; (e) improvement of existing drainage channels and construction of cross-drainage and diversion structures to collect local flows; (f) upgrading of existing project roads and construction of additional roads in the area; and (g) procurement of vehicles and equipment. The project also includes provision for a comprehensive study of the water and land resources of the Central Luzon Basin with the objective of identifying potential irrigation projects and formulating a plan for their development taking into account other beneficial water resources. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Philippines |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Hydro, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Philippines
- Design and construction of the third bridge of the Candaba Viaduct awarded by the NLEX Corporation in the north of Manila (Philippines)
- Metro Manila Skyway (MMS) Stage 3
- South Luzon Tollway Corporation
- Daang Hari-SLEX Link Road
- Bocaue Toll Barrier expansion
- North Luzon Expressway (NLEX) Harbor Link Tollway Project, Manila, Philippines
- NAIA Expressway
- Manila North Tollway Corporation
