IRRIG. IX
Sector: Water Supply and Storage • Location: Indonesia
Source: World Bank Group
Major components of the Ninth Irrigation Project are: (a) completion of the rehabilitation and improvement of irrigation and flood control and drainage works of the 30,000 ha Semarang-Demak-Kudus (SEDEKU) irrigation system in Central Java, including tertiary development on 17,000 ha; (b) construction of the initial stage (3,500ha) of the 20,000 ha Sungai Dareh-Sitiung irrigation system in West Sum
- Status
- Closed
- Sector
- Water Supply and Storage, Automotive, Waste Processing and Treatment, Raw Materials, Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about IRRIG. IX
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major components of the Ninth Irrigation Project are: (a) completion of the rehabilitation and improvement of irrigation and flood control and drainage works of the 30,000 ha Semarang-Demak-Kudus (SEDEKU) irrigation system in Central Java, including tertiary development on 17,000 ha; (b) construction of the initial stage (3,500ha) of the 20,000 ha Sungai Dareh-Sitiung irrigation system in West Sumatera; feasibility study for the remaining 16,500 ha and, subject to agreement of the Government and the Bank, detailed engineering and preparation of tender documents; and (c) studies, surveys, investigations and mapping of nine small- to medium-sized irrigation projects in Java, Sumatera and Sulawesi. In addition, the project makes provision for consultant services and for procurement of vehicles and equipment. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Automotive, Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
