logo

IRRIG. VI

Sector: Road • Location: Indonesia

Source: World Bank Group

Project
Closed

In Cirebon, the Sixth Irrigation Project provides for the rehabilitation of existing headworks and weirs; construction of primary, secondary, tertiary and quaternary canal systems; improvement and construction of drains and related flood protection works; implementation of 20 pilot projects to demonstrate the benefit of on-farm development; upgrading of existing access roads and construction of in

Status
Closed
Sector
Road, Water Supply and Storage, Waste Processing and Treatment, Hydro, Raw Materials, Government, Residential, Commercial
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about IRRIG. VI

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “IRRIG. VI” is an infrastructure initiative in the Road sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In Cirebon, the Sixth Irrigation Project provides for the rehabilitation of existing headworks and weirs; construction of primary, secondary, tertiary and quaternary canal systems; improvement and construction of drains and related flood protection works; implementation of 20 pilot projects to demonstrate the benefit of on-farm development; upgrading of existing access roads and construction of inspection roads; and construction of office buildings, stores and houses for project staff. In Rentang, the project provides for the construction of a new barrage and irrigation intakes on the Cimanuk River; construction of tertiary and quaternary canals and drains; improvement and construction of drains to serve a low-lying coastal area of 30,000 ha; and construction of 20 pilot on-farm development projects. In Sampean Baru, the project provides for remodeling of the existing weir and intake structure; construction of an earth fill closure dam on the Sampean River; rehabilitation and completion of the primary canal and structures and construction of secondary, tertiary and quaternary systems; construction of rural and inspection roads; the construction of two pilot on-farm development projects; and a pump irrigation demonstration scheme for upland crops.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Waste Processing and Treatment, Hydro, Raw Materials, Government, Residential, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project