logo

IRRIG. XVI

Sector: Water Supply and Storage • Location: Indonesia

Source: World Bank Group

Project
Closed

The Sixteenth Irrigation Project will comprise: (a) construction of the second stage of the Sitiung irrigation system in Sumatra to serve about 7,600 ha of transmigrant and local farmer lands; (b) improvement of management information systems of the Directorate General of Water Resources Development; (c) training and support for water users and their associations; (d) expansion of DGWRD's basic hy

Project Information FAQ

Project Information

5 Q
The project “IRRIG. XVI” is an infrastructure initiative in the Water Supply and Storage sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Sixteenth Irrigation Project will comprise: (a) construction of the second stage of the Sitiung irrigation system in Sumatra to serve about 7,600 ha of transmigrant and local farmer lands; (b) improvement of management information systems of the Directorate General of Water Resources Development; (c) training and support for water users and their associations; (d) expansion of DGWRD's basic hydrological data network; (e) and studies for development of the Cisanggarung River Basin and detailed design of the Jatigede Dam. The project will create a demand for some 21 million man-days of labor over the construction period, and will increase rice production by about 36,000 tons/year by 1990. The main risk facing the project is that, in the Sitiung II component, agricultural benefits might build up slower than projected; however, sensitivity analysis indicates that this risk lies within tolerable limits. Other project components, including designs and studies of future projects and assistance to DGWRD for institution building, bear low risk.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data