Irrigation & Drainage Rehabilitation Project (Serbia)
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Serbia Irrigation and Drainage Rehabilitation Project aims to: (a) improve the capacity for increased efficiency of agricultural production through support to high priority rehabilitation of drainage and irrigation infrastructure; (b) reduce the risk of damage from flooding to land, crops, property, infrastructure as well as reduce risk of life loss from flooding in project areas; and (c) impr
- Status
- Closed
- Sector
- Water Supply and Storage, Fertilizers, Waste Processing and Treatment, Consumer Products, Raw Materials, Government, Commercial
- Location
- Serbia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Irrigation & Drainage Rehabilitation Project (Serbia)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Serbia Irrigation and Drainage Rehabilitation Project aims to: (a) improve the capacity for increased efficiency of agricultural production through support to high priority rehabilitation of drainage and irrigation infrastructure; (b) reduce the risk of damage from flooding to land, crops, property, infrastructure as well as reduce risk of life loss from flooding in project areas; and (c) improve water resources management and strengthen the associated water resource management institutions and policies. There are four project components: Component 1, Rehabilitation and Improvement of Drainage and Flood Control Infrastructure, consists of rehabilitation and improvement works including: (a) repairing drainage facilities, including pumps and maintenance equipment; and (b) repairing flood control defenses to give a 1 in 100 year flood protection for agricultural and minor settlements, and a 1 in 1,000 year protection for large settlements and industry. Component 2, Minor Irrigation Development Program, supports the development and/or rehabilitation and improvement o f minor irrigation schemes mainly in the hilly regions of Central and Southern Serbia. Component 3, Institutional Strengthening and Capacity Building, aims to strengthen the institutional capacity o f water sector institutions. It will strengthen the capacity of the Water Directorate in its regulatory and strategic functions, particularly in the irrigation and drainage sub-sector. The component also provides various equipment and studies for other public institutions in the water sector. Component 4, Project Management and Monitoring, provides support for: (a) overall project management and technical assistance in such areas as detailed design and construction supervision, procurement, financial management and participatory water management; (b) implementation of environmental management plans for rehabilitation and construction activities that will be carried out under the project; and (c) annual financial audit of project accounts. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration |
Budget |
Location
Country | Serbia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Fertilizers, Waste Processing and Treatment, Consumer Products, Raw Materials, Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
