logo
ProjectClosed

Irrigation & Drainage Rehabilitation Project (Serbia)

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The Serbia Irrigation and Drainage Rehabilitation Project aims to: (a) improve the capacity for increased efficiency of agricultural production through support to high priority rehabilitation of drainage and irrigation infrastructure; (b) reduce the risk of damage from flooding to land, crops, property, infrastructure as well as reduce risk of life loss from flooding in project areas; and (c) impr

Status
Closed
Sector
Water Supply and Storage, Fertilizers, Waste Processing and Treatment, Consumer Products, Raw Materials, Government, Commercial
Location
Serbia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Irrigation & Drainage Rehabilitation Project (Serbia)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Irrigation & Drainage Rehabilitation Project (Serbia)” is an infrastructure initiative in the Water Supply and Storage sector, located in Serbia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Serbia Irrigation and Drainage Rehabilitation Project aims to: (a) improve the capacity for increased efficiency of agricultural production through support to high priority rehabilitation of drainage and irrigation infrastructure; (b) reduce the risk of damage from flooding to land, crops, property, infrastructure as well as reduce risk of life loss from flooding in project areas; and (c) improve water resources management and strengthen the associated water resource management institutions and policies. There are four project components: Component 1, Rehabilitation and Improvement of Drainage and Flood Control Infrastructure, consists of rehabilitation and improvement works including: (a) repairing drainage facilities, including pumps and maintenance equipment; and (b) repairing flood control defenses to give a 1 in 100 year flood protection for agricultural and minor settlements, and a 1 in 1,000 year protection for large settlements and industry. Component 2, Minor Irrigation Development Program, supports the development and/or rehabilitation and improvement o f minor irrigation schemes mainly in the hilly regions of Central and Southern Serbia. Component 3, Institutional Strengthening and Capacity Building, aims to strengthen the institutional capacity o f water sector institutions. It will strengthen the capacity of the Water Directorate in its regulatory and strategic functions, particularly in the irrigation and drainage sub-sector. The component also provides various equipment and studies for other public institutions in the water sector. Component 4, Project Management and Monitoring, provides support for: (a) overall project management and technical assistance in such areas as detailed design and construction supervision, procurement, financial management and participatory water management; (b) implementation of environmental management plans for rehabilitation and construction activities that will be carried out under the project; and (c) annual financial audit of project accounts.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration

Budget

Location

Country

Serbia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Fertilizers, Waste Processing and Treatment, Consumer Products, Raw Materials, Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project