logo

Irrigation Dam Safety

Sector: Water Supply and Storage • Location: Armenia

Source: World Bank Group

Project
Closed

Three complete dam failures occurred in Armenia in 1974, 1979, and 1994 respectively. All reported accidents could have been avoided if proper surveillance and operation and Maintenance procedures were in place. Such observations suggest that other failures cannot be rules out if the situation of dam safety in Armenia is allowed to remain out of control. Considering that no dam is reported to have

Project Information FAQ

Project Information

5 Q
The project “Irrigation Dam Safety” is an infrastructure initiative in the Water Supply and Storage sector, located in Armenia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Three complete dam failures occurred in Armenia in 1974, 1979, and 1994 respectively. All reported accidents could have been avoided if proper surveillance and operation and Maintenance procedures were in place. Such observations suggest that other failures cannot be rules out if the situation of dam safety in Armenia is allowed to remain out of control. Considering that no dam is reported to have a functioning instrumentation system and that country-wide around 460,000 people are at risk, the situation should be regarded as an emergency. Accordingly, the Dam Safety Project aims to protect the population and the socio-economic infrastructure downstream of the dams facing the highest risk of failure. This project has two main components. The first component supports repair work on primary irrigation dams including design and supervision, field tests, civil works, hydraulic steel structures. Rehabilitation consists of upstream protection works, spillway structural repairs, leakage reduction, and irrigation/bottom outlet repair. The second component prepares, operates, and supervises dam safety plans for operation and maintenance and an emergency preparedness plan; finances dam safety site installations, which include instruments and monitoring devices and early warning systems; strengthens the capacity of the Dam Maintenance Enterprise; and supports safety investigations into all remaining dams in Armenia.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data