Irrigation Distribution System & Management Improvement Project
Sector: Water Supply and Storage • Location: Azerbaijan
Source: World Bank Group
The development objective of the proposed Irrigation Distribution System and Management Improvement Project (IDSMIP) is to improve the effectiveness and financial viability of irrigation water distribution and management on 56,000 ha, through provision of support to Water Users Associations (WUA) and the State Amelioration and Irrigation Committee (SAIC). There are 3 components to the project. 1)
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The development objective of the proposed Irrigation Distribution System and Management Improvement Project (IDSMIP) is to improve the effectiveness and financial viability of irrigation water distribution and management on 56,000 ha, through provision of support to Water Users Associations (WUA) and the State Amelioration and Irrigation Committee (SAIC). There are 3 components to the project. 1) This component would include several activities, designed to develop sustainable operating WUAs in the country. It would finance technical assistance, goods and training. 2) During project preparation diagnostic surveys were carried out in nine project raions. The main technical findings of the survey work were: (i) on-farm systems are in poor condition with high water losses; (ii) canals are seriously affected by the heavy silt load in irrigation water due to non-functioning desilting at headworks; (iii) there is lack of operational hydraulic structures, and therefore no regulation or water measurement, and thus no incentive for efficient use of water; (iv) pump irrigation is seriously affected by poor quality of pumps and unreliable electricity supply; and (v) significant areas have been affected by salinity, and reclamation would be needed. 3) With the similarities in implementation requirements for the ongoing Rehabilitation and Completion of Irrigation and Drainage Infrastructure Project, the existing PKJ would also be responsible, on behalf of SAIC, for the daily management, administration and coordination of the IDSMIP. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
