logo

Irrigation Distribution System & Management Improvement Project

Sector: Water Supply and Storage • Location: Azerbaijan

Source: World Bank Group

Project
Closed

The development objective of the proposed Irrigation Distribution System and Management Improvement Project (IDSMIP) is to improve the effectiveness and financial viability of irrigation water distribution and management on 56,000 ha, through provision of support to Water Users Associations (WUA) and the State Amelioration and Irrigation Committee (SAIC). There are 3 components to the project. 1)

Project Information FAQ

Project Information

5 Q
The project “Irrigation Distribution System & Management Improvement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Azerbaijan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the proposed Irrigation Distribution System and Management Improvement Project (IDSMIP) is to improve the effectiveness and financial viability of irrigation water distribution and management on 56,000 ha, through provision of support to Water Users Associations (WUA) and the State Amelioration and Irrigation Committee (SAIC). There are 3 components to the project. 1) This component would include several activities, designed to develop sustainable operating WUAs in the country. It would finance technical assistance, goods and training. 2) During project preparation diagnostic surveys were carried out in nine project raions. The main technical findings of the survey work were: (i) on-farm systems are in poor condition with high water losses; (ii) canals are seriously affected by the heavy silt load in irrigation water due to non-functioning desilting at headworks; (iii) there is lack of operational hydraulic structures, and therefore no regulation or water measurement, and thus no incentive for efficient use of water; (iv) pump irrigation is seriously affected by poor quality of pumps and unreliable electricity supply; and (v) significant areas have been affected by salinity, and reclamation would be needed. 3) With the similarities in implementation requirements for the ongoing Rehabilitation and Completion of Irrigation and Drainage Infrastructure Project, the existing PKJ would also be responsible, on behalf of SAIC, for the daily management, administration and coordination of the IDSMIP.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data