Irrigation Distribution System & Management Improvement Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The development objective of the proposed Irrigation Distribution System and Management Improvement Project (IDSMIP) is to improve the effectiveness and financial viability of irrigation water distribution and management on 56,000 ha, through provision of support to Water Users Associations (WUA) and the State Amelioration and Irrigation Committee (SAIC). There are 3 components to the project. 1)
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Consumer Products, Raw Materials, Waste Processing and Treatment, Government
- Location
- Azerbaijan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Irrigation Distribution System & Management Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the proposed Irrigation Distribution System and Management Improvement Project (IDSMIP) is to improve the effectiveness and financial viability of irrigation water distribution and management on 56,000 ha, through provision of support to Water Users Associations (WUA) and the State Amelioration and Irrigation Committee (SAIC). There are 3 components to the project. 1) This component would include several activities, designed to develop sustainable operating WUAs in the country. It would finance technical assistance, goods and training. 2) During project preparation diagnostic surveys were carried out in nine project raions. The main technical findings of the survey work were: (i) on-farm systems are in poor condition with high water losses; (ii) canals are seriously affected by the heavy silt load in irrigation water due to non-functioning desilting at headworks; (iii) there is lack of operational hydraulic structures, and therefore no regulation or water measurement, and thus no incentive for efficient use of water; (iv) pump irrigation is seriously affected by poor quality of pumps and unreliable electricity supply; and (v) significant areas have been affected by salinity, and reclamation would be needed. 3) With the similarities in implementation requirements for the ongoing Rehabilitation and Completion of Irrigation and Drainage Infrastructure Project, the existing PKJ would also be responsible, on behalf of SAIC, for the daily management, administration and coordination of the IDSMIP. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration |
Budget |
Location
Country | Azerbaijan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Consumer Products, Raw Materials, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
