logo
ProjectClosed

Irrigation Distribution System & Management Improvement Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The development objective of the proposed Irrigation Distribution System and Management Improvement Project (IDSMIP) is to improve the effectiveness and financial viability of irrigation water distribution and management on 56,000 ha, through provision of support to Water Users Associations (WUA) and the State Amelioration and Irrigation Committee (SAIC). There are 3 components to the project. 1)

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Consumer Products, Raw Materials, Waste Processing and Treatment, Government
Location
Azerbaijan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Irrigation Distribution System & Management Improvement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Irrigation Distribution System & Management Improvement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Azerbaijan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the proposed Irrigation Distribution System and Management Improvement Project (IDSMIP) is to improve the effectiveness and financial viability of irrigation water distribution and management on 56,000 ha, through provision of support to Water Users Associations (WUA) and the State Amelioration and Irrigation Committee (SAIC). There are 3 components to the project. 1) This component would include several activities, designed to develop sustainable operating WUAs in the country. It would finance technical assistance, goods and training. 2) During project preparation diagnostic surveys were carried out in nine project raions. The main technical findings of the survey work were: (i) on-farm systems are in poor condition with high water losses; (ii) canals are seriously affected by the heavy silt load in irrigation water due to non-functioning desilting at headworks; (iii) there is lack of operational hydraulic structures, and therefore no regulation or water measurement, and thus no incentive for efficient use of water; (iv) pump irrigation is seriously affected by poor quality of pumps and unreliable electricity supply; and (v) significant areas have been affected by salinity, and reclamation would be needed. 3) With the similarities in implementation requirements for the ongoing Rehabilitation and Completion of Irrigation and Drainage Infrastructure Project, the existing PKJ would also be responsible, on behalf of SAIC, for the daily management, administration and coordination of the IDSMIP.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration

Budget

Location

Country

Azerbaijan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Consumer Products, Raw Materials, Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project