logo

Irrigation Management Improvement Investment Program

Sector: Water Supply and Storage • Location: Bangladesh

Source: Asian Development Bank (ADB)

Project
Closed

The TA will address due diligence requirements for the MFF Program and support investment preparation to be financed through the Project 1 of the MFF, including the (i) physical modernization of the Muhuri Irrigation Project (MIP), and (ii) the establishment of a specialized management unit (SMU) in the MIP. The TA will prepare the following outputs. Their summary and activities are shown in Table

Project Information FAQ

Project Information

5 Q
The project “Irrigation Management Improvement Investment Program” is an infrastructure initiative in the Water Supply and Storage sector, located in Bangladesh. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The TA will address due diligence requirements for the MFF Program and support investment preparation to be financed through the Project 1 of the MFF, including the (i) physical modernization of the Muhuri Irrigation Project (MIP), and (ii) the establishment of a specialized management unit (SMU) in the MIP. The TA will prepare the following outputs. Their summary and activities are shown in Table A4.1.The first component of the project preparatory TA (PPTA) will focus on due diligence of MFF processing requirements. The following outputs will be delivered: (i) a refined policy framework, (ii) a sector roadmap, (iii) a medium term investment program, (iv) a Program financing plan, (v) a Program design and monitoring framework, (vi) necessary safeguards frameworks (environment, resettlement and socials) and institutional and governance frameworks to guide future tranches of the MFF program, and (vii) the facility administration manual. Importantly, the TA will provide recommendations to establish the Program Management Unit (PMU), which will assist with the implementation of the investment program, and the activities under Project 1 (covering safeguards, institutional, technical, etc.) as well as the preparation of physical and non physical investments for inclusion under the subsequent tranches. The PPTA will also prepare the bidding documents for the PMU consultants and equipment procurement to ensure quick Program implementation start up.The second component of the PPTA will be preparation of the investment project under the Project 1 and its due diligence requirements. The outputs will include (i) Project 1 investment plan, design and monitoring framework; (ii) detailed terms of reference of SMU and facilitating entity (FE), clarifying their roles and responsibilities, and contractual obligations to each other and BWDB; (iii) staffing requirements of SMU and initiating Government of Bangladesh procedures for staffing; (iv) engagement with private sector partners who would be interested in acting as FE; (v) procurement details and development of service contract to reflect BWDB, FE, and SMU contractual relationship; (vi) financial management capacity assessment of BWDB and governance requirements of FE and SMU; (vii) updated safeguards planning documents; (viii) updated social and poverty analysis and gender action plan; (ix) updated available feasibility studies and detailed designs of MIP primary system, and terms of reference for further engineering survey, design, drawings, and bid documents of MIP modernization works; (x) updated cost estimate, irrigation service charge rate to be established, and economic and financial analyses; and (xi) draft Development Project Proforma (DPP).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data