IRRIGATION REHAB III

Sector: Road • Location: Indonesia

Source: World Bank Group

Project
Closed

The Third Rehabilitation Project consists of the repair and construction of barrages, weirs, and minor canal structures; desilting and clearing of primary and secondary canals; repairs to canal side-slopes and embankments; construction of step landings on canal banks to control access for domestic purposes; the improvement and construction of drainage canals and structures; repair and construction

Project Information FAQ

Project Information

5 Q
The project “IRRIGATION REHAB III” is an infrastructure initiative in the Road sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Third Rehabilitation Project consists of the repair and construction of barrages, weirs, and minor canal structures; desilting and clearing of primary and secondary canals; repairs to canal side-slopes and embankments; construction of step landings on canal banks to control access for domestic purposes; the improvement and construction of drainage canals and structures; repair and construction of surface roads and inspection canals along primary and secondary canals; construction of new canals, drains, structures and inspection paths on limited extension areas, and the construction of the first 50 m of each tertiary canal with structures. Farmers traditionally supply their labor free to construct and maintain these canals. In the event that they fail to do so in reasonable time, agreement was reached that the Government will cause all tertiary canals to be completed within 12 months after the first 50 m of such canals have been completed by PROSIDA.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data