logo

IRRIGATION VII

Sector: Water Supply and Storage • Location: Romania

Source: World Bank Group

Project
Closed

The main objectives of the Bucsani Buzau Siret Prut Irrigation Project will be to increase and stabilize crop production and to raise productivity in a gross area of 158,485 ha (154,350 ha net) consisting of four separate subprojects in the areas of Bucsani, Buzau, Siret, and Prut located in the southeastern part of Romania. This will be accomplished through construction of irrigation and drainage

Project Information FAQ

Project Information

5 Q
The project “IRRIGATION VII” is an infrastructure initiative in the Water Supply and Storage sector, located in Romania. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The main objectives of the Bucsani Buzau Siret Prut Irrigation Project will be to increase and stabilize crop production and to raise productivity in a gross area of 158,485 ha (154,350 ha net) consisting of four separate subprojects in the areas of Bucsani, Buzau, Siret, and Prut located in the southeastern part of Romania. This will be accomplished through construction of irrigation and drainage systems and related facilities. The project works will include construction of 184 km of open canals and 187 km of pipe conduits, nine repumping, two fixed and 97 pressure pumping stations, surface and tile drainage systems, soil erosion control, valley training and saline soil reclamation works. Equipment for operation and maintenance and farm machinery will be provided under the project. Concrete silos for a total capacity of 0.18 million tons will also be constructed to meet the additional cereal storage requirement. Benefits from crop production in the project areas will increase from a fluctuating annual average of about $106.1 million to a relatively stable annual average of about $242.8 million. Yield increases in various crops will range from 25 percent to over 200 percent and the cropping intensity will increase by about 16 percent. The project will more than double labor productivity.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data