logo
ProjectClosed

IRRIGATION VII

Closed · Romania

Source: World Bank Group

The main objectives of the Bucsani Buzau Siret Prut Irrigation Project will be to increase and stabilize crop production and to raise productivity in a gross area of 158,485 ha (154,350 ha net) consisting of four separate subprojects in the areas of Bucsani, Buzau, Siret, and Prut located in the southeastern part of Romania. This will be accomplished through construction of irrigation and drainage

Status
Closed
Sector
Water Supply and Storage, Fertilizers, Power Generation (CCGT), Waste Processing and Treatment, Cement, Raw Materials, Government
Location
Romania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about IRRIGATION VII

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “IRRIGATION VII” is an infrastructure initiative in the Water Supply and Storage sector, located in Romania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objectives of the Bucsani Buzau Siret Prut Irrigation Project will be to increase and stabilize crop production and to raise productivity in a gross area of 158,485 ha (154,350 ha net) consisting of four separate subprojects in the areas of Bucsani, Buzau, Siret, and Prut located in the southeastern part of Romania. This will be accomplished through construction of irrigation and drainage systems and related facilities. The project works will include construction of 184 km of open canals and 187 km of pipe conduits, nine repumping, two fixed and 97 pressure pumping stations, surface and tile drainage systems, soil erosion control, valley training and saline soil reclamation works. Equipment for operation and maintenance and farm machinery will be provided under the project. Concrete silos for a total capacity of 0.18 million tons will also be constructed to meet the additional cereal storage requirement. Benefits from crop production in the project areas will increase from a fluctuating annual average of about $106.1 million to a relatively stable annual average of about $242.8 million. Yield increases in various crops will range from 25 percent to over 200 percent and the cropping intensity will increase by about 16 percent. The project will more than double labor productivity.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Romania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Fertilizers, Power Generation (CCGT), Waste Processing and Treatment, Cement, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project