Irving Street Green Infrastructure Project
Sector: Government • Location: Washington
Source: District of Columbia Water and Sewer Authority (DC Water)
DC Water installed bioretention at 14 sites in median islands and the roadside along the Irving Street corridor between Michigan Avenue and North Capitol Street. The installation of bioretention is part of the overall flood control solution to mitigate chronic sewer flooding in the area.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | DC Water installed bioretention at 14 sites in median islands and the roadside along the Irving Street corridor between Michigan Avenue and North Capitol Street. The installation of bioretention is part of the overall flood control solution to mitigate chronic sewer flooding in the area. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
