Isabella County Struble Drain
Sector: Waste Processing and Treatment • Location: Mount Pleasant, Michigan, United States of America
Source: Dodge
The project is to be let in 2 divisions. Division 1 includes approximately 2.1 miles of open drain improvements including sediment removal, site clearing, and soil and erosion control measures. Division 2 includes replacement of approximately 2.6 miles of tile drain with new plastic storm sewer ranging from 12 to 24 in diameter.
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial)
- Location
- Mount Pleasant, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Isabella County Struble Drain
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is to be let in 2 divisions. Division 1 includes approximately 2.1 miles of open drain improvements including sediment removal, site clearing, and soil and erosion control measures. Division 2 includes replacement of approximately 2.6 miles of tile drain with new plastic storm sewer ranging from 12 to 24 in diameter. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Mount Pleasant |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
