ISD 196 Eagan High School Site Improvements
Closed · Minnesota · Last reported Sep 2025
Source: Dodge
The project consists of modifications and additions to the Parking lot areas, including added storm water retention. Bids will be opened publicly and read aloud at the above time and place. Bids received after 2:00 PM will not be opened. A single lump sum bid will be received for all portions of the work shown below and as defined in Sections 00 42 00 of the Project Specification: 31A Earthwork, U
- Status
- Closed
- Sector
- Waste Processing and Treatment, Car parking, Water Supply and Storage, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Government, Manufacturing (Industrial)
- Location
- Eagan, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about ISD 196 Eagan High School Site Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of modifications and additions to the Parking lot areas, including added storm water retention. Bids will be opened publicly and read aloud at the above time and place. Bids received after 2:00 PM will not be opened. A single lump sum bid will be received for all portions of the work shown below and as defined in Sections 00 42 00 of the Project Specification: 31A Earthwork, Utilities, and Site Work Project Name: Eagan HS Site Improvements Owner Name: Independent School D... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Eagan |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Water Supply and Storage, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
