ISDA Main Administration Blg/Weights & Measures Lab
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Phase 1: Weights and Measures - Full roof replacement, complete demolition of suspended ceiling system, geothermal HVAC system, lighting, exterior overhead doors, interior doors and frames, and restrooms. Install a new standalone HVAC system, suspended acoustical ceiling system, LED lighting, overhead exterior door, interior doors, frame, hardware and new restrooms. The Necropsy will consist of ne
- Status
- Closed
- Sector
- Geothermal, Manufacturing (Industrial), Commercial
- Location
- Boise, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about ISDA Main Administration Blg/Weights & Measures Lab
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 1: Weights and Measures - Full roof replacement, complete demolition of suspended ceiling system, geothermal HVAC system, lighting, exterior overhead doors, interior doors and frames, and restrooms. Install a new standalone HVAC system, suspended acoustical ceiling system, LED lighting, overhead exterior door, interior doors, frame, hardware and new restrooms. The Necropsy will consist of new overhead door, exterior main door, LED lighting work platform, miscellaneous plumbing and inter... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Boise |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Geothermal, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in United States of America
- SOLAR THERMAL INSTALLATION, EVACUATED SOLAR COLLECTOR TUBES AND 950 LITER BUFFER TANK
- The Music Center at Strathmore
- National Museum of the American Indian
- Waterfront Station
- Wheaton Revitalization Project
- Polk Street Resurfacing & Sidewalk
- Primary and Secondary Calibration on Active Layer (PASCAL)
- Industrial Efficiency and Decarbonization Office (IEDO) FY23 Multi-Topic FOA
