logo
ProjectBid Results

Isla Vista Trash Capture

Bid results · California · Last reported Jul 2024

Source: Dodge USA

The Isla Vista Trash Capture Project is installation of a hydrodynamic separator to treat storm water runoff. The project is located within the public road right of way at approximately 6560 El Colegio Road in Isla Vista, CA 93117. The scope of work includes water pollution control, excavation, shoring, dewatering, installation of a diversion weir, installation of a County-procured HDS unit, road

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial
Location
Isla Vista, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Isla Vista Trash Capture

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Isla Vista Trash Capture” is an infrastructure initiative in the Water Supply and Storage sector, located in Isla Vista, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Isla Vista Trash Capture Project is installation of a hydrodynamic separator to treat storm water runoff. The project is located within the public road right of way at approximately 6560 El Colegio Road in Isla Vista, CA 93117. The scope of work includes water pollution control, excavation, shoring, dewatering, installation of a diversion weir, installation of a County-procured HDS unit, road demo, and restoration. The work will require an approved Traffic Control Plan and a Shoring Plan ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Isla Vista

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial

Article published date

2024-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project