Islais Creek Bridge Rehabilitation Project

Sector: Automotive • Location: San Francisco, California, United States of America

Source: SF Public Works

Project
Close

Project Description, Public Works is proposing to replace the existing Islais Creek Bridge along Third Street in the City and County of San Francisco. The existing Islais Creek Bridge is structurally deteriorated and seismically deficient. The proposed replacement bridge will meet current structural and seismic standards and will be resilient to predicted sea-level-rise impacts., Construction of t

Project Information FAQ

Project Information

5 Q
The project “Islais Creek Bridge Rehabilitation Project” is an infrastructure initiative in the Automotive sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SF Public Works.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project Description, Public Works is proposing to replace the existing Islais Creek Bridge along Third Street in the City and County of San Francisco. The existing Islais Creek Bridge is structurally deteriorated and seismically deficient. The proposed replacement bridge will meet current structural and seismic standards and will be resilient to predicted sea-level-rise impacts., Construction of the proposed project will result in replacement of the existing drawbridge with a fixed bridge at a higher elevation. The existing drawbridge has not been used to accommodate large ships for approximately 50 years. The bridge was originally built in 1949 and was designed to only carry vehicular and pedestrian traffic. In 2007, SFMTA retrofitted the bridge to carry two light rail tracks, with overhead electric wires and poles to provide power to light rail vehicles. The existing bridge now carries four lanes of vehicle traffic, two Muni light rail tracks, and two sidewalks. Apart from a new pedestrian/bike path, the project will not change the existing lane configuration of the bridge. The new bridge will accommodate a center 26 foot-wide zone dedicated to light-rail transit tracks, two 11 foot vehicle traffic lanes in each direction, a 12 foot-wide shared pedestrian/bicycle path on the eastern side of the bridge, and a 16 foot-wide shared pedestrian/bicycle path on the western side of the bridge., Construction is anticipated to last approximately 36 months, including 24 months of field construction, barring any rain delays or unforeseen field conditions. Field construction is not expected to start on this project before spring 2026., The proposed project will include demolition and removal of the existing bridge deck, including all electrical equipment and drive machinery needed to open the drawbridge. These features will be replaced with a new 115-foot-long, 114-foot-wide, single-span precast/prestressed concrete through-girder bridge featuring a concrete deck with a cast-in-place, reinforced-concrete topping. Sections of the new bridge will be constructed off site, barged to the project site, and placed into position with the use of both barge-mounted cranes and cranes on the Third Street approach, spanning modified abutments. The new bridge deck will be made up of precast/prestressed concrete box girders and through girders with transverse post tensioning. Debris containment systems would be used for work over water to prevent airborne or falling debris from entering the Islais Creek channel., Throughout the field construction duration, there will be no access for vehicles, the T-Third Street light rail service, or pedestrians to the bridge or Third Street between Marin Street to the north and Cargo Way to the south. During this period, T-Third Street passengers will use bus shuttles in lieu of light rail service south of Islais Creek Bridge and transfer to light rail service north of Islais Creek Bridge. Details of the bus-substitution are currently being developed and will be shared with the public well in advance of construction. The 15 Bayview Hunters Point Express bus will be detoured around the project site using the adjacent Illinois Street Bridge. A detailed traffic management plan will be used to detour vehicles, bicycles, and pedestrians around the site using other routes to minimize congestion.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data