Island Estates Cast Iron Water Main Replacement
Sector: Metal • Location: Clearwater, Florida, United States of America
Source: Dodge USA
The work includes: Installation of water main sizes ranging from 2 to 24 using various installation methods including open cut, jack and bore, and horizontal directional drilling to loop, replace, and relocate water mains identified by the City as needing repair. Proposed construction includes associated fittings, valves, appurtenances, connections, etc. for all proposed work.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work includes: Installation of water main sizes ranging from 2 to 24 using various installation methods including open cut, jack and bore, and horizontal directional drilling to loop, replace, and relocate water mains identified by the City as needing repair. Proposed construction includes associated fittings, valves, appurtenances, connections, etc. for all proposed work. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
