logo

Island Street Infrastructure

Sector: Water Supply and Storage • Location: Keene, New Hampshire, United States of America

Source: Dodge USA

Project
Closed

The Island Street infrastructure project proposes replacement of underground utilities including: 1,420 feet of water main; 2,580 feet of sewer main; 1,450 feet of storm drainage piping; 1,420 square yards of 4 and 8-inch sidewalks and base; 2,380 feet of granite curbing; road reconstruction including more than 3,500 cubic yards of base gravels and 1,500 tons of asphalt pavement.

Status
Closed
Sector
Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Automotive, Government, Commercial, Power Generation (CCGT)
Location
Keene, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Island Street Infrastructure

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Island Street Infrastructure” is an infrastructure initiative in the Water Supply and Storage sector, located in Keene, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Island Street infrastructure project proposes replacement of underground utilities including: 1,420 feet of water main; 2,580 feet of sewer main; 1,450 feet of storm drainage piping; 1,420 square yards of 4 and 8-inch sidewalks and base; 2,380 feet of granite curbing; road reconstruction including more than 3,500 cubic yards of base gravels and 1,500 tons of asphalt pavement.

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Keene

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Automotive, Government, Commercial, Power Generation (CCGT)

Article published date

2024-04-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project