Ispartakule - Cerkezkoy Railway Line
Disbursing · Türkiye
Source: European Bank for Reconstruction and Development (EBRD)
The Ispartakule- Çerkezköy Railway Project is being developed by the General Directorate of Infrastructure Investments (AYGM). The Project is a part of the new high-speed railway (the Halkali - Kapikule railway line) between Istanbul and Kapikule near the Bulgarian border. The Halkali - Kapikule railway line will connect Turkey’s railway network with the Trans European Transport Network (“TEN-T”)
- Status
- Under Construction
- Sector
- Rail, Power Generation (CCGT), Mass Transit, Commercial, Residential
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Ispartakule - Cerkezkoy Railway Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | disbursing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Ispartakule- Çerkezköy Railway Project is being developed by the General Directorate of Infrastructure Investments (AYGM). The Project is a part of the new high-speed railway (the Halkali - Kapikule railway line) between Istanbul and Kapikule near the Bulgarian border. The Halkali - Kapikule railway line will connect Turkey’s railway network with the Trans European Transport Network (“TEN-T”) through Bulgaria and will, therefore, set a milestone for the railway connectivity between Turkey and the EU countries. The Project involves the construction of a 67 km section of new high-speed railway line from Ispartakule to Çerkezköy: 200 km/h max design speed, double track, electrified railway and the required systems including ERTMS Level 1, power supply and auxiliaries. Halkali –Kapikule railway line is composed of Phase 1 (Çerkezköy-Kapikule) and Phase 2 which also has 2 sections (Halkali-Ispartakule and Ispartakule-Çerkezköy). Phase 1 (which is under construction) and Halkali – Ispartakule section of Phase 2 will not be part of the Project financed by the Bank. The Project is categorised “A” under EBRD's Environmental and Social Policy (2014) as it has the potential to have significant environmental and social (E&S) impacts associated with the construction and operation of a long-distance railway line. A comprehensive Environmental and Social Impact Assessment (ESIA) and associated documents have been developed, followed by their public disclosure for a minimum period of 120 days. Due to COVID-19 restrictions for public gatherings the Client has revised the stakeholder engagement activities for the disclosure period and alternative engagement approaches have been identified in the SEP, which has been disclosed by the Client and the Bank. Environmental and Social Action Plan: English | Turkish Non-Technical Summary: English | Turkish Stakeholder Engagement Plan: Turkish | English Resettlement Action Plan and GLAC: English | Turkish Resettlement Action Plan Addendum: English | Turkish ESIA Package English ESIA Package Turkish Full ESIA documentation General Directorate of Infrastructure Investments Hakkı Turayliç Caddesi No:5 Emek Çankaya Ankara and EBRD Resident Office, Istanbul Resident Office, Büyükdere Caddesi, 185 Kanyon Ofis Binası, Kat: 2, Levent, 34394 Istanbul, Turkey Tel: +90 212 386 1100 and Client website Environmental or social enquiries |
Original sector | Transport |
Budget |
Location
Country | Turkey |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Rail, Power Generation (CCGT), Mass Transit, Commercial, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
