Issyk-Kul Sustainable Development Project
Closed · Kyrgyz Republic
Source: Asian Development Bank (ADB)
The IssykKul Sustainable Development Project (the Project) is the first phase in a longer-term initiative by the Asian Development Bank (ADB) to support environmental management and to improve urban service delivery in the Issyk-Kul Oblast. ADB and government collaboration in Issyk-Kul will ensure that urban services interventions will increase access to potable water and safe sanitation, includin
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Biomass, Residential, Oil and Gas, Manufacturing (Industrial), Power Generation (CCGT), Telecommunications, Steel, Government, Hotel, Commercial
- Location
- Kyrgyzstan
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Issyk-Kul Sustainable Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The IssykKul Sustainable Development Project (the Project) is the first phase in a longer-term initiative by the Asian Development Bank (ADB) to support environmental management and to improve urban service delivery in the Issyk-Kul Oblast. ADB and government collaboration in Issyk-Kul will ensure that urban services interventions will increase access to potable water and safe sanitation, including use of proven technologies for treatment and disposal of solid and liquid waste. The Project will (i) improve urban infrastructure, including sewerage and sanitation, solid waste management, water supply, and community upgrading; and (ii) improve service delivery through better enterprise resource management. The Project covers the cities of Balykchy, Cholpon-Ata, and Karakol. Its outputs are:(i)replacing a 13.4-kilometer (km) sewer network (specifically addressing pumping mains to sewage treatment plants); rehabilitating pumping stations in Balykchy and Karakol; extending the sewer network by 12 km to uncovered areas in Karakol; and supplying relevant tools, equipment, and vehicles for sewer maintenance; (ii)management of 42.5 hectares of existing waste dumps improved to increase environmental safety and sites operation lifetime and solid waste collection service coverage increased in three project cities;(iii)installing 8,550 water meters, training vodokanal enterprises in meter reading and leak control, constructing a presedimentation treatment tank at the Karakol water headworks, replacing a 2 km corroded transmission main in Balykchy, and reconstructing 10 boreholes (with treatment, energy efficient pumps, storage, and protection facilities) in Balykchy and Cholpon-Ata; (iv)providing in the three project cities, water and sanitation facilities in pre-schools, schools and health care organizations; and (v)implementing an enterprise resource management component comprising a management information system, accounting and financial management, geographic information system, asset inventory and management, and institutional effectiveness program for cities, vodokanal enterprises and tazalyk enterprises. |
Original sector | Water and other urban infrastructure and services |
Budget |
Location
Country | Kyrgyzstan |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Biomass, Residential, Oil and Gas, Manufacturing (Industrial), Power Generation (CCGT), Telecommunications, Steel, Government, Hotel, Commercial |
Article published date | 2024-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Kyrgyz Republic
- Kumtor Gold Company
- IWS Smart Farm
- Myrzaki-Kurshab water extension
- Institutional Strengthening of the Road Sector
- Osh-Isfana Road Upgrading Project Phase II
- Central Asia Regional Economic Cooperation Corridor 3 (Bishkek-Osh Road) Improvement Project, Phase 4
- Bishkek Solid Waste
- Kemin Balykchy Interconnection
