Issyk-Kul Sustainable Development Project
Sector: Road • Location: Kyrgyz Republic
Source: Asian Development Bank (ADB)
The IssykKul Sustainable Development Project (the Project) is the first phase in a longer-term initiative by the Asian Development Bank (ADB) to support environmental management and to improve urban service delivery in the Issyk-Kul Oblast. ADB and government collaboration in Issyk-Kul will ensure that urban services interventions will increase access to potable water and safe sanitation, includin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The IssykKul Sustainable Development Project (the Project) is the first phase in a longer-term initiative by the Asian Development Bank (ADB) to support environmental management and to improve urban service delivery in the Issyk-Kul Oblast. ADB and government collaboration in Issyk-Kul will ensure that urban services interventions will increase access to potable water and safe sanitation, including use of proven technologies for treatment and disposal of solid and liquid waste. The Project will (i) improve urban infrastructure, including sewerage and sanitation, solid waste management, water supply, and community upgrading; and (ii) improve service delivery through better enterprise resource management. The Project covers the cities of Balykchy, Cholpon-Ata, and Karakol. Its outputs are:(i)replacing a 13.4-kilometer (km) sewer network (specifically addressing pumping mains to sewage treatment plants); rehabilitating pumping stations in Balykchy and Karakol; extending the sewer network by 12 km to uncovered areas in Karakol; and supplying relevant tools, equipment, and vehicles for sewer maintenance; (ii)management of 42.5 hectares of existing waste dumps improved to increase environmental safety and sites operation lifetime and solid waste collection service coverage increased in three project cities;(iii)installing 8,550 water meters, training vodokanal enterprises in meter reading and leak control, constructing a presedimentation treatment tank at the Karakol water headworks, replacing a 2 km corroded transmission main in Balykchy, and reconstructing 10 boreholes (with treatment, energy efficient pumps, storage, and protection facilities) in Balykchy and Cholpon-Ata; (iv)providing in the three project cities, water and sanitation facilities in pre-schools, schools and health care organizations; and (v)implementing an enterprise resource management component comprising a management information system, accounting and financial management, geographic information system, asset inventory and management, and institutional effectiveness program for cities, vodokanal enterprises and tazalyk enterprises. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
