Istanbul Municipal Infrastructure Project
One of 10,000+ projects Taiyo tracks in Turkey.
Source: World Bank Group
The objectives of the Istanbul Municipal Infrastructure Project (IMIP) in Turkey are to assist the Istanbul Metropolitan Municipality in: (i) improving its solid waste management; and (ii) improving its capacity to mitigate earthquakes by retrofitting key facilities and infrastructure and upgrading the institutions and their procedures to help them respond to emergencies. The IMIP would consist of
- Status
- Closed
- Sector
- Water Supply and Storage, Biomass, Waste Processing and Treatment, Government
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Istanbul Municipal Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Istanbul Municipal Infrastructure Project (IMIP) in Turkey are to assist the Istanbul Metropolitan Municipality in: (i) improving its solid waste management; and (ii) improving its capacity to mitigate earthquakes by retrofitting key facilities and infrastructure and upgrading the institutions and their procedures to help them respond to emergencies. The IMIP would consist of four components with the first being improvements in environmental management: this includes closure of existing unauthorized disposal sites for municipal solid waste (landfills) and rehabilitation of creeks; preparation of annual business plans that include operating performance, investment program and financial targets and results; and financing waste collection equipment. The second component is strengthening of municipal services and infrastructure which includes: preparing a detailed risk assessment for all major municipal systems; preparing a Municipal Infrastructure Risk Mitigation Plan; retrofitting of municipal infrastructure (under-passes, pipelines, viaducts etc.); and providing emergency fire department equipment. The third component is the pilot urban transformation program which includes: pilot urban transformation feasibility studies; and retrofitting and construction of buildings, fire stations and emergency housing associated with urban transformation in the most seismic vulnerable areas. The final component is the project management and audits, this consists of: design studies, surveys and technical training for project implementation; and external audits of project accounts. |
Original sector | FY17 - Industry, Trade and Services,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Turkey |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Biomass, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
