logo
ProjectClosed

Istanbul Municipal Infrastructure Project

One of 10,000+ projects Taiyo tracks in Turkey.

Source: World Bank Group

The objectives of the Istanbul Municipal Infrastructure Project (IMIP) in Turkey are to assist the Istanbul Metropolitan Municipality in: (i) improving its solid waste management; and (ii) improving its capacity to mitigate earthquakes by retrofitting key facilities and infrastructure and upgrading the institutions and their procedures to help them respond to emergencies. The IMIP would consist of

Status
Closed
Sector
Water Supply and Storage, Biomass, Waste Processing and Treatment, Government
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Istanbul Municipal Infrastructure Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Istanbul Municipal Infrastructure Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the Istanbul Municipal Infrastructure Project (IMIP) in Turkey are to assist the Istanbul Metropolitan Municipality in: (i) improving its solid waste management; and (ii) improving its capacity to mitigate earthquakes by retrofitting key facilities and infrastructure and upgrading the institutions and their procedures to help them respond to emergencies. The IMIP would consist of four components with the first being improvements in environmental management: this includes closure of existing unauthorized disposal sites for municipal solid waste (landfills) and rehabilitation of creeks; preparation of annual business plans that include operating performance, investment program and financial targets and results; and financing waste collection equipment. The second component is strengthening of municipal services and infrastructure which includes: preparing a detailed risk assessment for all major municipal systems; preparing a Municipal Infrastructure Risk Mitigation Plan; retrofitting of municipal infrastructure (under-passes, pipelines, viaducts etc.); and providing emergency fire department equipment. The third component is the pilot urban transformation program which includes: pilot urban transformation feasibility studies; and retrofitting and construction of buildings, fire stations and emergency housing associated with urban transformation in the most seismic vulnerable areas. The final component is the project management and audits, this consists of: design studies, surveys and technical training for project implementation; and external audits of project accounts.

Original sector

FY17 - Industry, Trade and Services,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Biomass, Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project