logo

Istanbul Municipal Infrastructure Project

Sector: Water Supply and Storage • Location: Turkey

Source: World Bank Group

Project
Closed

The objectives of the Istanbul Municipal Infrastructure Project (IMIP) in Turkey are to assist the Istanbul Metropolitan Municipality in: (i) improving its solid waste management; and (ii) improving its capacity to mitigate earthquakes by retrofitting key facilities and infrastructure and upgrading the institutions and their procedures to help them respond to emergencies. The IMIP would consist of

Project Information FAQ

Project Information

5 Q
The project “Istanbul Municipal Infrastructure Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objectives of the Istanbul Municipal Infrastructure Project (IMIP) in Turkey are to assist the Istanbul Metropolitan Municipality in: (i) improving its solid waste management; and (ii) improving its capacity to mitigate earthquakes by retrofitting key facilities and infrastructure and upgrading the institutions and their procedures to help them respond to emergencies. The IMIP would consist of four components with the first being improvements in environmental management: this includes closure of existing unauthorized disposal sites for municipal solid waste (landfills) and rehabilitation of creeks; preparation of annual business plans that include operating performance, investment program and financial targets and results; and financing waste collection equipment. The second component is strengthening of municipal services and infrastructure which includes: preparing a detailed risk assessment for all major municipal systems; preparing a Municipal Infrastructure Risk Mitigation Plan; retrofitting of municipal infrastructure (under-passes, pipelines, viaducts etc.); and providing emergency fire department equipment. The third component is the pilot urban transformation program which includes: pilot urban transformation feasibility studies; and retrofitting and construction of buildings, fire stations and emergency housing associated with urban transformation in the most seismic vulnerable areas. The final component is the project management and audits, this consists of: design studies, surveys and technical training for project implementation; and external audits of project accounts.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data