Istanbul third airport BOT project
Sector: Airport • Location: Turkey
Source: InfraPPPWorld
Construction and operation of a third airport in Istanbul under the Build-Operate-Transfer (BOT) model.Istanbul New Airport or Third Airport is an international airport under construction in Arnavutköy district on the European side of Istanbul, Turkey. The airport is poised to be the largest airport in the world, with a 150 million passenger annual capacity. It will be the third international airp
- Status
- Closed
- Sector
- Airport
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Istanbul third airport BOT project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | financial close |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction and operation of a third airport in Istanbul under the Build-Operate-Transfer (BOT) model.Istanbul New Airport or Third Airport is an international airport under construction in Arnavutköy district on the European side of Istanbul, Turkey. The airport is poised to be the largest airport in the world, with a 150 million passenger annual capacity. It will be the third international airport to be built in Istanbul, however, Istanbul Atatürk Airport will be closed down once the new airport is operational. |
Original sector | Transport |
Budget |
Location
Country | Turkey |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Airport |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
