Istria & Slovene Coast Water Supply & Sewerage Project
Sector: Water Supply and Storage • Location: Slovenia
Source: World Bank Group
The project comprises two components, the Slovene Coast component and the Istria component, financed by two separate loans. Both components include water and sewerage works. Bank loan funds will not be used for the sewerage works. The project will, in the service areas of the borrowers: (i) eliminate existing water shortages through provision of source works and rehabilitation of treatment plants;
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project comprises two components, the Slovene Coast component and the Istria component, financed by two separate loans. Both components include water and sewerage works. Bank loan funds will not be used for the sewerage works. The project will, in the service areas of the borrowers: (i) eliminate existing water shortages through provision of source works and rehabilitation of treatment plants; (ii) provide additional water supply capacity needed for expansion of the tourist industry and growth in domestic and industrial/commercial need; (iii) reduce unaccounted for water through provision of training and control systems; (iv) protect existing water sources and coastal tourist areas from pollution; and (v) increase the overall efficiency of water supply and sewerage services. The Water Supply and Sewerage Project comprises two components, the Slovene Coast component and the Istria component, financed by two separate loans. Both components include water and sewerage works. Bank loan funds will not be used for the sewerage works. The project will, in the service areas of the borrowers: (i) eliminate existing water shortages through provision of source works and rehabilitation of treatment plants; (ii) provide additional water supply capacity needed for expansion of the tourist industry and growth in domestic and industrial/commercial need; (iii) reduce unaccounted for water through provision of training and control systems; (iv) protect existing water sources and coastal tourist areas from pollution; and (v) increase the overall efficiency of water supply and sewerage services. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
