IT Infrastructure Upgrades - Package 2 REBID
Sector: Broadband • Location: Fairfax, Virginia, United States of America
Source: Dodge USA
This project is generally described as Outside Plant (OSP) IT [communications] upgrade at the George Mason University s Fairfax campus. The Communications improvements span the entirety of the George Mason (GMU) Fairfax Campus. The work includes the addition of new duct-banks and fiber optic cabling being installed, and upgrades to the of existing infrastructure, Manholes (MHs) and Handholds (HHs)
- Status
- Closed
- Sector
- Broadband, Education, Telecommunications, Commercial, Manufacturing (Industrial)
- Location
- Fairfax, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about IT Infrastructure Upgrades - Package 2 REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is generally described as Outside Plant (OSP) IT [communications] upgrade at the George Mason University s Fairfax campus. The Communications improvements span the entirety of the George Mason (GMU) Fairfax Campus. The work includes the addition of new duct-banks and fiber optic cabling being installed, and upgrades to the of existing infrastructure, Manholes (MHs) and Handholds (HHs), and exterior mounted Wireless Access Point. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Fairfax |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Education, Telecommunications, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
