logo

Itaenga Thermal Power Plant

Sector: Geothermal • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Termoeletrica Itaenga Ltda, a wholly-owned subsidiary of Grupo Petribu, was granted an authorization to build a 22-MW thermal power plant located in the state of Pernambuco (municipality of Lagoa de Itaenga). The cogeneration power plant was set to use sugar cane residues, wood or oil as fuel.

In March 2002, Termoeletrica Itaenga Ltda signed a 30-year contract with the re

Status
Prospective
Sector
Geothermal, Oil and Gas, Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Itaenga Thermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Itaenga Thermal Power Plant” is an infrastructure initiative in the Geothermal sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Termoeletrica Itaenga Ltda, a wholly-owned subsidiary of Grupo Petribu, was granted an authorization to build a 22-MW thermal power plant located in the state of Pernambuco (municipality of Lagoa de Itaenga). The cogeneration power plant was set to use sugar cane residues, wood or oil as fuel. In March 2002, Termoeletrica Itaenga Ltda signed a 30-year contract with the regulatory agency ANEEL allowing the company to operate in the electricity market as a independent producer. This authorization granted the sponsor with the right to sell electricity in the Brazilian wholesale market. The company established supply contracts with Comercializadora Brasileira de Energia Emergencial (CBEE). The estimated investment on the 22-MW power plant was US$ 12 million in 2007 value (BRL 30 million in 2002 value). The power plant commenced operations in February 2007. In 2008, the company was granted the authorization to expand its capacity to 47 MW. The estimated investment commitment on this expansion was not available. In February 2009, the company was granted a US$ 32.3 million (BRL 64.7 million) loan contract from BNDES, a state-owned development bank. Construction works on this new generating unit were concluded in May 2010.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Geothermal, Oil and Gas, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project