logo

Italian H2 Backbone

Sector: Hydrogen • Location: Italy

Source: Hydrogen Insight

Project
Planned

The Italian H2 Backbone is a planned hydrogen pipeline running from an entry point in Sicily to interconnections with Austria and Switzerland. It will stretch across 1,920 km and be capable of importing 4.4 million tonnes of hydrogen per year into Sicily and transmitting 1.7 million tonnes per year into or out of Austria. The pipeline will largely be made up of repurposed gas pipelines, expected t

Project Information FAQ

Project Information

5 Q
The project “Italian H2 Backbone” is an infrastructure initiative in the Hydrogen sector, located in Italy. Taiyo aggregates data on it from Hydrogen Insight.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Italian H2 Backbone is a planned hydrogen pipeline running from an entry point in Sicily to interconnections with Austria and Switzerland. It will stretch across 1,920 km and be capable of importing 4.4 million tonnes of hydrogen per year into Sicily and transmitting 1.7 million tonnes per year into or out of Austria. The pipeline will largely be made up of repurposed gas pipelines, expected to constitute 65% of the network. Snam has received a €24 million grant for engineering studies and plans to spend €24 million from its own funds for development work. The project is also set to be linked to Snam’s wider “SoutH2” corridor, which will import renewable hydrogen produced in North Africa to meet industrial demand in Central Europe.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data