Itapebi power plant
Sector: Commercial • Location: Bahia, Brazil
Source: World Bank Group
Itabepi Geracao de Energia SA won a 35 years concession to build and operate the 450 MW Itapebi hydroelectric power plant in the Jequetinhinha River, at Bahia state. The Spanish group Iberdrola SA, the sponsor of the company, offered the winning bid of US$ 8 million (R$ 14.3 million) in the Aneel’s (Brazilian energy regulatory agency) auction. The concession contract was award by Aneel in April
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Hydro, Government
- Location
- Bahia, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Itapebi power plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Itabepi Geracao de Energia SA won a 35 years concession to build and operate the 450 MW Itapebi hydroelectric power plant in the Jequetinhinha River, at Bahia state. The Spanish group Iberdrola SA, the sponsor of the company, offered the winning bid of US$ 8 million (R$ 14.3 million) in the Aneel’s (Brazilian energy regulatory agency) auction. The concession contract was award by Aneel in April of 1999, and the project reached financial closure in January of 2000. The construction of the power plant was launched in 2000 and the Hydroelectric started operations in June 2003. Itabepi Geracao de Energia SA initially announced that it expected to invest US$ 278.9 million (R$ 500 million) in the project. In October 2003, Itapebi raised US$ 69 million (R$ 200 million) with the issue of non-convertible debentures. As of 2005, Itapebi was owned by Neoenergia (42%), Iberdrola's subsidiary Iberener (22.6%), 521 Participacoes (16.4%) and Banco do Brasil's direct stake of (19%). Banco do Brasil also had a 12% stake in Neoenergia, along with Previ (49%) and Iberdrola (39%). None None |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Brazil |
State | Bahia |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Hydro, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
