ITER Central Solenoid Magnet
The owner, status and timeline of this project. A free account opens every field.
Source: Energy Reporters
The ITER project has completed the sixth and final component of the reactor's central solenoid, a superconducting magnet powerful enough to levitate an aircraft carrier. This magnet is crucial for creating and sustaining the superheated plasma necessary for nuclear fusion in the ITER Tokamak reactor. It will weigh nearly 3,000 tons, stand 42.6 feet tall and 13.1 feet wide, and endure forces equiva
- Status
- Closed
- Sector
- Aerospace & Defense, Nuclear, Power Generation (CCGT)
- Updated
- 22 Jul 2026
- Source
- Energy Reporters
ConstructChat
Ask ConstructChat about ITER Central Solenoid Magnet
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The ITER project has completed the sixth and final component of the reactor's central solenoid, a superconducting magnet powerful enough to levitate an aircraft carrier. This magnet is crucial for creating and sustaining the superheated plasma necessary for nuclear fusion in the ITER Tokamak reactor. It will weigh nearly 3,000 tons, stand 42.6 feet tall and 13.1 feet wide, and endure forces equivalent to 13.5 million pounds. The magnet stores 6.4 gigajoules of magnetic energy and is key to producing 500 megawatts of power with an input of only 50 megawatts, marking a significant milestone towards sustainable fusion energy. |
Original sector | Energy |
Location
| Not available for this record. |
Source
Source | Energy Reporters |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Nuclear, Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Aerospace & Defense projects
- Projet 16e - 17e - Porte Maillot
- Toronto Airport Piers D and E Fixed Bridges
- Museum of the Regiments
- T2228-01 Install Solar Array Army Aviation Support Facility
- Labcon North America Expansion Project
- SAT Terminal B
- Southwest Airlines BWI New Tech Ops Hangar East
- SFO United Airlines Terminal 3 Ticket Counter Redesign and Break Room Refresh
