Itezhi-Tezhi Hydro Power and Transmission Line Project - IRS
Sector: Hydro • Location: Zambia
Source: European Union Africa Infrastructure Trust Fund
The Itezhi-Tezhi Hydropower Project (ITT) consists of two components: a) The development, financing construction, operation and maintenance of a 120MW base load Hydro Power Plant at the site of the existing ITT dam on the Kafue River in Zambia. b) The new Transmission Line (of approximately 280km) via Mumbwa onto Lusaka West that will connect the power station to the national grid and through it t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under disbursement |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Itezhi-Tezhi Hydropower Project (ITT) consists of two components: a) The development, financing construction, operation and maintenance of a 120MW base load Hydro Power Plant at the site of the existing ITT dam on the Kafue River in Zambia. b) The new Transmission Line (of approximately 280km) via Mumbwa onto Lusaka West that will connect the power station to the national grid and through it to the South African Region. The transmission line is to be developed, constructed, financed and operated by ZESCO. The overall project will take advantage of an existing infrastructure and add a power station to limit construction/cost/risk as well as keep environmental impact low and minimize resettlement. The new Transmission Line will wheel renewable energy produced for the benefit of Zambia and ultimately the South African region. As of end-2018, the project is near to completion. A EUR 17.1 million EU-AITF Interest Rate Subsidy applies to both the EIB and AFD loans financing the Itezhi Tezhi project. It reduces the interest rate of the loans to a level compatible with the debt sustainability requirements as the country is a Least Developed Country which has undergone debt restructuring under the HIPC initiative. The IRS applies to the transmission line as well as for the equity injection into ITPC for the hydropower plant, and is used simultaneously with EIB’s and AFD’s loan disbursements which started in 2015. As of end-2018, an amount of EUR 13.87m was used, while the remaining balance stands at EUR 3.2m. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |