Itezhi-Tezhi Hydro Power and Transmission Line Project - TA

Sector: Hydro • Location: Zambia

Source: European Union Africa Infrastructure Trust Fund

Project
Close

The Itezhi-Tezhi Hydropower Project (ITT) consists of two components. a) The development, financing construction, operation and maintenance of a 120MW base load Hydro Power Plant at the site of the existing ITT dam on the Kafue River in Zambia. b) The new Transmission Line (of approximately 280km) via Mumbwa onto Lusaka West that will connect the power station to the national grid and through it t

Project Information FAQ

Project Information

4 Q
The project “Itezhi-Tezhi Hydro Power and Transmission Line Project - TA” is an infrastructure initiative in the Hydro sector, located in Zambia. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Itezhi-Tezhi Hydropower Project (ITT) consists of two components. a) The development, financing construction, operation and maintenance of a 120MW base load Hydro Power Plant at the site of the existing ITT dam on the Kafue River in Zambia. b) The new Transmission Line (of approximately 280km) via Mumbwa onto Lusaka West that will connect the power station to the national grid and through it to the South African Region. The transmission line is to be developed, constructed, financed and operated by ZESCO. The overall project will take advantage of an existing infrastructure and add a power station to limit construction/cost/risk as well as keep environmental impact low and minimize resettlement. The new Transmission Line will wheel renewable energy produced for the benefit of Zambia and ultimately the South African region. As of end-2018, the project is near to completion. The EU-AITF Technical Assistance grant was used to fund the Lenders’ Engineer (LE) to strengthen and accompany implementation capacity of the promoter (ZESCO) for the Project. The LE interacted closely with the Project Implementation Unit (PIU) for all matters related to physical implementation and financial follow-up (e.g. procurement, disbursement, monitoring, reporting). As the Transmission Line Kafue Livingstone Project has the same promoter and similar characteristics, the same TA (i.e. the same LE) also supported the latter project. The Service Contract was signed during the second quarter of 2013 and the LE carried out his assignments until June 2016.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data