Itimpi II Solar Plant
Sector: Power Generation (CCGT) • Location: Kitwe, Northern Province, Zambia
Source: pv magazine International
The 136 MW Itimpi II solar plant is Zambia's largest operational solar project to date. It is located in Kitwe, northern Zambia, built on approximately 170 hectares of land, and took 14 months to construct. The project was funded by Copperbelt Energy Corporation's $200 million Green Bond and cost $125.8 million. It created 2,568 jobs during construction, with over 95% held by Zambians, and over 10
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar
- Location
- Kitwe, Northern Province, Zambia
- Updated
- 22 Jul 2026
- Source
- pv magazine International
ConstructChat
Ask ConstructChat about Itimpi II Solar Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 136 MW Itimpi II solar plant is Zambia's largest operational solar project to date. It is located in Kitwe, northern Zambia, built on approximately 170 hectares of land, and took 14 months to construct. The project was funded by Copperbelt Energy Corporation's $200 million Green Bond and cost $125.8 million. It created 2,568 jobs during construction, with over 95% held by Zambians, and over 100 permanent jobs. |
Original sector | Energy |
Budget |
Location
Country | Zambia |
State | Northern Province |
City | Kitwe |
Source
Source | pv magazine International |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar |
Article published date | 2026-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
