Itronics Green Technology Campus
One of 10,000+ projects Taiyo tracks in Nevada.
Source: Dodge USA
The site is zoned for fertilizer manufacturing, chemical manufacturing, and foundry operations. Special use permits will be required for specific operations. The facility is on 48 acres, has five buildings with 60,000 square feet under roof, with a 9 million dollar replacement value on the existing structures. It also has four dry product silos and four vertical liquid tanks, and is adjacent to a
- Status
- Failure
- Sector
- Commercial, Manufacturing (Industrial), Chemical (Industrial), Fertilizers, Rail
- Location
- Yerington, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Itronics Green Technology Campus
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The site is zoned for fertilizer manufacturing, chemical manufacturing, and foundry operations. Special use permits will be required for specific operations. The facility is on 48 acres, has five buildings with 60,000 square feet under roof, with a 9 million dollar replacement value on the existing structures. It also has four dry product silos and four vertical liquid tanks, and is adjacent to a rail siding. |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Yerington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Chemical (Industrial), Fertilizers, Rail |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
