Its Sugar Building
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
To conduct interior renovations to existing 8,420sf space in Opry Mills Mall for " IT'S SUGAR ". cynthia eng You have been invited by Sykes, Ronya (Codes) to join a Bluebeam Studio Session: T2023003788 Its Sugar Session ID: 436-257-920 Session URL: s/436-257-920
- Status
- Under Construction
- Sector
- Commercial, Consumer Products, Residential, Raw Materials, Manufacturing (Industrial)
- Location
- Nashville, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Its Sugar Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To conduct interior renovations to existing 8,420sf space in Opry Mills Mall for " IT'S SUGAR ". cynthia eng You have been invited by Sykes, Ronya (Codes) to join a Bluebeam Studio Session: T2023003788 Its Sugar Session ID: 436-257-920 Session URL: https://epr.nashville.gov/hyperlink.html?link=epr.nashville.gov/session s/436-257-920 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Nashville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Consumer Products, Residential, Raw Materials, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
