logo
ProjectClosed

Ituiutaba Bioenergy Project

One of 10,000+ projects Taiyo tracks in Brazil.

Source: Inter-American Development Bank (IADB)

The operation has the following main objectives: (i) further improve the competitiveness of the sugar and ethanol industry in Brazil by having a low-cost vertically-integrated facility (i.e., fully mechanized harvesting system, lowest cost renewable electricity, and lower land costs) in a region that concentrates more than 80% of Brazil's sugar and ethanol industry (Center South), as well as, sati

Status
Closed
Sector
Biomass, Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
Inter-American Development Bank (IADB)

ConstructChat

Ask ConstructChat about Ituiutaba Bioenergy Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ituiutaba Bioenergy Project” is an infrastructure initiative in the Biomass sector, located in Brazil. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The operation has the following main objectives: (i) further improve the competitiveness of the sugar and ethanol industry in Brazil by having a low-cost vertically-integrated facility (i.e., fully mechanized harvesting system, lowest cost renewable electricity, and lower land costs) in a region that concentrates more than 80% of Brazil's sugar and ethanol industry (Center South), as well as, satisfying part of the growing domestic and international demand of ethanol; (ii) create significant impact on the regional economy, by contributing to the creation of business and technological clustering; (iii) generate direct and indirect jobs (during construction and operation); and (iv) increase the contribution of bioenergy in the national energy matrix (i.e., with 56 MW of biomass-based renewable energy).

Original sector

-

Budget

Location

Country

Brazil

Source

Source

Inter-American Development Bank (IADB)

URL

More Details

Record type

Project

Sector

Biomass, Power Generation (CCGT), Government

Article published date

2025-06-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project