logo

Ivanpah Solar Plant Closure

Sector: Solar • Location: Mojave, California, United States

Source: Pedirayudas

Project
Planned Closure

Ivanpah solar power plant, once the world's largest solar thermal plant, located in Mojave Desert, California, will close in 2026 due to financial difficulties, technological advancements, and environmental concerns. The plant used over 300,000 computer-controlled mirrors and 173,500 heliostats to generate electricity by reflecting sunlight to water-filled boilers to produce steam. The plant faced

Status
Closed
Sector
Solar, Water Supply and Storage, Power Generation (CCGT), Geothermal, Manufacturing (Industrial)
Location
Mojave, California, United States of America
Updated
22 Jul 2026
Source
Pedirayudas

ConstructChat

Ask ConstructChat about Ivanpah Solar Plant Closure

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ivanpah Solar Plant Closure” is an infrastructure initiative in the Solar sector, located in Mojave, California, United States. Taiyo aggregates data on it from Pedirayudas.

Participants

Company

Status

Original status

planned closure

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ivanpah solar power plant, once the world's largest solar thermal plant, located in Mojave Desert, California, will close in 2026 due to financial difficulties, technological advancements, and environmental concerns. The plant used over 300,000 computer-controlled mirrors and 173,500 heliostats to generate electricity by reflecting sunlight to water-filled boilers to produce steam. The plant faced operational complexity and environmental issues, including bird deaths caused by intense light reflection. The plant cost $2.18 billion to build, with major investments from NRG Energy and Google.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

California

City

Mojave

Source

Source

Pedirayudas

URL

More Details

Record type

Project

Sector

Solar, Water Supply and Storage, Power Generation (CCGT), Geothermal, Manufacturing (Industrial)

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project