Iway (I-195 Relocation Project)
Sector: Bridge • Location: Rhode Island, United States of America
Source: Federal Highway Administration (FHWA)
Iway is composed of 16 individual projects to relocate a 45-year-old 1.6-mile stretch of I-195 and an adjacent 0.8-mile portion of I-95 through Providence. The highway was relocated 2,000 feet to the south of its former alignment and outside the barrier which protects the 350-year-old city from hurricane flooding. The project included 14 new bridges with a 1,200-foot, 8-lane mainline bridge over t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Iway is composed of 16 individual projects to relocate a 45-year-old 1.6-mile stretch of I-195 and an adjacent 0.8-mile portion of I-95 through Providence. The highway was relocated 2,000 feet to the south of its former alignment and outside the barrier which protects the 350-year-old city from hurricane flooding. The project included 14 new bridges with a 1,200-foot, 8-lane mainline bridge over the Providence River, 25 lane-miles of new interstate, a new interchange with I-95, five miles of new city streets, and 4,100 feet of new pedestrian riverwalks. In addition, removal of the existing interstate freed up 20 acres of prime downtown real estate currently under redevelopment by the I-195 Redevelopment Commission. The mainline Iway Bridge (Providence River Bridge) garnered national attention for its construction innovation. The bridge was largely constructed offsite to avoid more complicated barge-based construction and to allow simultaneous construction of its concrete foundation. The bridge was floated 12 miles into place in August 2006. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
