logo
ProjectCompleted

IWK - Air Handling, Safety & Infection Control Project

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

The Project includes several elements to improve COVID and patient safety measures: 1. Air Handling Unit Replacement in Children’s Building - Current unit is deteriorating. It is housed on the top of the Children’s building. Significant rusting damage - floor pans are gone and rusted out, multiple recent repairs to the coils. Struggles greatly in cold temperatures. 2. Air Handling System Improvem

Status
Closed
Sector
Commercial, Government
Location
Nova Scotia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about IWK - Air Handling, Safety & Infection Control Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “IWK - Air Handling, Safety & Infection Control Project” is an infrastructure initiative in the Commercial sector, located in Nova Scotia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project includes several elements to improve COVID and patient safety measures: 1. Air Handling Unit Replacement in Children’s Building - Current unit is deteriorating. It is housed on the top of the Children’s building. Significant rusting damage - floor pans are gone and rusted out, multiple recent repairs to the coils. Struggles greatly in cold temperatures. 2. Air Handling System Improvements in Women’s & Link Buildings - The unit currently supplying critical care areas (i.e. NICU, PICU, Emerg., and Dentistry) does not have enough capacity to meet needs. The air handling distribution system with be reconfigured to balance loads with another unit that has available capacity to ensure all areas have an adequate air supply. 3. Hand Sink Replacements (Women’s Building) - Current inpatient hand hygiene sinks are not meeting handwashing infection control and patient / staff safety requirements and need to be replaced (Women’s 5th & 7th floors). 4. Sliding Door Installations - Current privacy drapes / curtains provide minimal privacy between patients / families and are a challenge to maintain (infection control concerns). Replacing drapes with sliding doors in FATC to meet CSA privacy standards, infection control and safety requirements.

Original sector

Community, Culture and Recreation

Location

Country

Canada

State

Nova Scotia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Commercial, Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project