IWK Hospital - Retrofits, Repairs and Upgrades Phase 2
Sector: Water Supply and Storage • Location: Nova Scotia, Canada
Source: Infrastructure Canada
The Project includes: 1. Water Booster Pump Upgrades (Women’s Building) Replacing current water pressure booster pumps which are ~50 years old, not efficient, and have been problematic. This will improve water pressure (particularly at the upper floors), reduce repairs, and potentially reduce energy costs. 2. Caulking Exterior Envelope IWK Buildings Replacing / renewing exterior caulking in proble
- Status
- Closed
- Sector
- Water Supply and Storage, Hospital, Power Generation (CCGT), Commercial, Government
- Location
- Nova Scotia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about IWK Hospital - Retrofits, Repairs and Upgrades Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes: 1. Water Booster Pump Upgrades (Women’s Building) Replacing current water pressure booster pumps which are ~50 years old, not efficient, and have been problematic. This will improve water pressure (particularly at the upper floors), reduce repairs, and potentially reduce energy costs. 2. Caulking Exterior Envelope IWK Buildings Replacing / renewing exterior caulking in problem areas throughout envelope of the IWK buildings to reduce ingress/penetration of water causing leaks which create operational disruptions, promotes mold growth which presents as an infection control risk to patients, occupants, and patient care. 3. Hot Water System Upgrade (Children’s Building) Upgrading 2 hot water heaters (+50 years old) which are currently having challenges maintaining water temps (compromising patient care and building operations). Repairs are becoming costly compared to cost of replacement. 4. Electrical Room Upgrade (Children’s Building) Installing heat pumps to reduce excessive heat which is prematurely deteriorating circuit breakers to reduce the risk of power shut down to the entire Children’s Building (impacting patient care and building operations). 5. Electrical System Improvements (Women’s Building) Replacing 2 failing distribution boards (~40 years old) to reduce risk of power shut down to the entire Women’s Building (impacting patient care and building operations). 6. Hot Water System Upgrade (Women’s Building) Upgrading hot water recirculating system which struggles to meet hot water demand (reduce risk delays which impacts patient care). [see key note regarding #6] |
Original sector | Community, Culture and Recreation |
Location
Country | Canada |
State | Nova Scotia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hospital, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
