Ixtepec (Oaxaca) - Yautepec (Morelos) transmission PPP project
The status, timeline and source of this project. A free account opens every field.
Source: InfraPPPWorld
The project involves the installation of seven 40 kV substations, two 500 kV converter stations, five 400 kV-AC transmission lines with a length of 437.3 km, and one 500 kV-DC transmission line with a length of 1,221 km, on a build, operate and transfer (BOT) basis. The transmission capacity will be 3,000 MW. The length of the BOT contract is 25 years.The works will pass through six regions of Mex
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Government
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Ixtepec (Oaxaca) - Yautepec (Morelos) transmission PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | project in tender |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the installation of seven 40 kV substations, two 500 kV converter stations, five 400 kV-AC transmission lines with a length of 437.3 km, and one 500 kV-DC transmission line with a length of 1,221 km, on a build, operate and transfer (BOT) basis. The transmission capacity will be 3,000 MW. The length of the BOT contract is 25 years.The works will pass through six regions of Mexico: Mexico City, State of Mexico, Morelos, Oaxaca, Puebla and Veracruz. Construction is expected to take 36 months. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Mexico |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
